Suzhou Kiande Electric Co.,Ltd.

Specialized in intelligent production equipment in electrical field!

Manufacturer from China
Active Member
5 Years
Home / Products / Busbar Accessories /

PA66 76mm Busduct Outgoing Sheath Busbar Tap Off Unit For Conversion

Contact Now
Suzhou Kiande Electric Co.,Ltd.
City:suzhou
Province/State:jiangsu
Country/Region:china
Contact Person:MsTina
Contact Now

PA66 76mm Busduct Outgoing Sheath Busbar Tap Off Unit For Conversion

Ask Latest Price
Video Channel
Model Number :KD-CZ
Certification :ISO9001
Supply Ability :100000pcs
Packaging Details :carton box
Brand Name :Kiande
Place of Origin :China
MOQ :100piece
Price :Negotiable
Payment Terms :L/C, T/T
Delivery Time :10days
Description :PA66 Nylon Busbar Plugs
Color :White
Model :KD-05/15, KD-03/13, KDK-19, KDK-22
Material :PA66
Remark :4P 5P
Usage :Used for busbar
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Busduct Outgoing Sheath for Busbar Tap Off Unit for Conversion

Its used for the prevent the dust and Sundries entering the tap off unite

PA66 76mm Busduct Outgoing Sheath Busbar Tap Off Unit For Conversion

Model Hole Diameter Max. Diameter for Wire
KD-KT4 φ76mm φ68mm
KD-KT3 φ66mm φ54mm

Installation Guideline of Tap Off Unit (Plug-In Type)

There are two types of plug-in tap-off units :

1) Plug-in tap-off units without automatic clamping system .

2) Plug-in tap-off units with automatic clamping system.
Step 1: Open or remove the tap-off unit cover.

Step 2: Install the protection device in the tap-off unit.

Step 3: Remove the IP protection on the outlet of the run component.

Step 4: Prepare the output cable glands and connect the cables to the tap-off unit.

Step 5: Check that the protection device is switched off and carefully inspect the tap-off unit for tools and objects that may have been left inside the tap-off unit.

Step 6: Position the rear of the tap-off unit on the run component.

Step 7: Plug the tap-off unit into the run component.

Step8: Lock the tap-off unit on the run component using the locking handle located inside the tap-off unit

Step9: Secure the tap-off unit on the run component using the fixing mechanism.

Step10: Close the tap-off unit cover. The system and the load are ready to be energized.

Inquiry Cart 0